All processing was done in PixInSIght. This time around I switched tools to stretch the data to "Masked Stretch". This seems to help with the overlap areas. I will add SII and Oiii when the moon co-operates and my even add data to the sides I missed now that I have the Mosaic schedule planner figured out in STellarMate. I was quiet shocked at how well the Plate solving worked in the SM Sceduler. Once I told it to start, I walked away and came back at the end, so I didn't adjust anything on the fly.
IC1805 2 Nights by Brent Secord, on Flickr